Changes between Version 4 and Version 5 of Presets/Power_Line_Mapping_IBEDC


Ignore:
Timestamp:
2015-10-07T10:25:33+02:00 (10 years ago)
Author:
Olumig
Comment:

Added Transmission Sub Stations

Legend:

Unmodified
Added
Removed
Modified
  • Presets/Power_Line_Mapping_IBEDC

    v4 v5  
    5454        <combo key="power:gauge" text="Conductor Size specified in mm" values="100,150" />
    5555    </item>
    56    
     56
     57    <item name="Transmission Substation" icon="presets/power.png" type="node,closedway">
     58        <space />
     59        <key key="power" value="substation" />
     60        <text key="name" text="Name" />
     61        <text key="substation" text="Type of substation" value="injection" />
     62        <combo key="rating" text="Power Rating  (MVA)" values="15,30,40,45,60,90,100" length="5" />
     63        <space />
     64        <combo key="operator" text="Name of Transysco Station" values="Aiyede, Ganmo, Ibadan North, Ijebu, Ile-Ife, Ilesa, Iwo, Jebba, Jericho,Ojere, Oke-Aro, Omu-Aran, Osogbop, Ota, Papalanto, Sagamu, Saw Mill"/>
     65        <combo key="unit" text="Business Hub" values="Ota, Olumo, Ijeun, Sagamu, Ijebu-Ode, Akanran, Apata, Dugbe, Molete, Monatan, Ogbomosho, Ojoo, Oyo, Ede, Ikirun, Ilesa, Ile-Ife, Osogbo, Baboko, Challenge, Jebba, Omu-Aran" />
     66   </item>
     67
    5768    <item name="Injection Substation" icon="presets/power.png" type="node,closedway">
    5869        <space />